Wellington, Grey and Bruce Railway 

(CN & CP in1968)

Jan 16, 2016 Update

Home

Story of My Railroad

The Prototype

Industries on the Layout

Specifications

Layout Track Plan

Layout Progress

Operations

What's New

Links of Interest

Contact Information

 

 

 

We had another work session in January.  Thanks to Rob Peck, Mark Collier, Grant Ledrew and Ron Snipe for helping to build more of the bench work.  Rob also assisted with some centre lines for the wye at Stellarton.

We built one large section and then put in a temporary leg until the connecting section was built.  Rob and Mark are working on the connecting section in this picture

 

Here is the new section with the connecting section and legs installed.

 

This is a look at the work done with the connecting section no installed.

 

This is another angle of the connecting section being built.