Wellington, Grey and Bruce Railway

(CN & CP in1968)

July 9, 2015 Update

Home

Story of My Railroad

The Prototype

Industries on the Layout

Specifications

Layout Track Plan

Layout Progress

Operations

What's New

Links of Interest

Contact Information

 

 

 

Lower Staging benchwork goes in as well as the first part of the main train room

Rob holding up a section of the lower staging.  This was a piece saved from the original layout

 

Michael and Dustin putting together the first section of the benchwork on the main train room

 

The lower and top ends of staging.  Each will have a loop going through the wall

 

Lower and upper staging in

 

Bill and Ron bracing the lower staging

 

Rob and Grant starting the lower staging benchwork

 

Lower and Upper staging benchwork

 

Upper and lower deck staging braced through the wall.  This is where the loop will go

Grant, Bill and Rob building the lower deck staging

 

Another view of upper and lower staging

 

John, Michael and Dustin putting up the first bench work in the main train room

 

John, Michael and Dustin putting up the first bench work in the main train room

Dustin and Rob built the top level loop and braced the sections on the opposite wall